装配式建筑中机电管线一体化设计与施工要点探究

董专政 ( 安徽建工三建集团有限公司 )

https://doi.org/10.37155/2972-435X-0310-8

Abstract

This article starts from four dimensions: resource integration, collaborative cooperation, quality assurance, and innovation mechanism, and proposes to strengthen the integration of design resources and establish a shared information system

Establish communication and feedback mechanisms, improve planning and adjustment mechanisms, clarify division of labor and cooperation models, promote construction coordination and management, formulate quality management standards, and establishMeasures such as supervision and evaluation system, implementation of regular inspection mechanism, establishment of incentive and innovation mechanism, exploration of diversified cooperation models, and introduction of modern management concepts are aimed at enhancing equipmentIntegrated design and construction level of mechanical and electrical pipelines in prefabricated buildings, promoting sustainable development of the construction industry.

Keywords

装配式建筑;机电管线一体化;设计施工协同

Full Text

PDF

References

[1]于海安,何文,黄佩兵.PC装配式建筑结构中机电管
线连接节点设计[J].重庆建筑,2023,22(2):67-69.
[2]金敬飞,杨佳男.装配式建筑机电管线预埋优化与应
用[J].建筑与装饰,2023(17):10-12.
[3]石穗嘉,LIYAOGEN.装配式建筑机电管线预制及安
装连接施工技术[J].中国住宅设施,2022(6):166-168.
[4]王仕平,郑云德.装配式建筑中机电管线配合施工注
意事项及措施[J].工程质量,2022,40(8):51-54.
[5]高腾飞.装配式建筑中机电管线配合施工注意事项
及措施[J].房地产导刊,2025(2):160-161.
[6]张莹.装配式建筑机电管线与新型建筑材料预制构
配件的设计研究[J].中国建材科技,2019,28(6):32-33,35.

Copyright © 2025 董专政 Creative Commons License Publishing time:2025-10-31
This work is licensed under a Creative Commons Attribution 4.0 International License