Analysis of Construction Technology for Drilled Pile in Water Conservancy Construction
张 伟 ( Rudong County Water Conservancy and Electric Power Construction Engineering Co., Ltd )
顾 峻 ( Rudong County Water Conservancy and Electric Power Construction Engineering Co., Ltd )
Xu Baoqing ( Rudong County Water Conservancy and Electric Power Construction Engineering Co., Ltd )
https://doi.org/10.37155/2811-0609-0406-3Abstract
The drilling and grouting pile technology in water conservancy construction is of great significance to the quality and stability of the project. This article provides a detailed analysis of its construction technology principles, covering pore forming
The principle of concrete pouring. In depth exploration of construction preparation work, including geological survey, site and material and equipment preparation. Key analysis of drilling, steel cage production and installationKey technologies such as installation, hole cleaning, and concrete pouring, as well as key points for construction quality control, such as establishing a quality monitoring system, forming holes, reinforcing steel cages, and ensuring the quality of concrete pouringThe aim is to provide comprehensive technical guidance for the construction of bored piles in hydraulic engineering, including control and pile quality testing techniques and evaluation standards, in order to improve construction quality and efficiencyEnsure the safe and stable operation of the project.Keywords
Construction technology principles; preparation; Key technical links; Construction safety and environmental protectionFull Text
PDFReferences
[J] Jiangxi Building Materials, 2020 (11): 102104
[2] Wang Xiaoye Application of Drilled Pile Technology in Water Conservancy Engineering Construction
[J] Residential and Real Estate, 2020 (33): 192199
[3] Zhu Zhen Application strategy of drilled pile technology in water conservancy engineering construction
Lue [J]. Jushe, 2020 (32): 35-36, 28
[4] Li Ang Research on Construction Technology of Drilled Pile [J]. Engineering Technology Research
Research, 2020,5 (8): 66-67
[5] Huang Guizhong Application of Drilled Pile Technology in Water Conservancy Engineering Construction [J]
Engineering Technology Research, 2019,4 (5): 38-39
Copyright © 2025 Zhang Wei, Gu Jun, Xu Baoqing
Publishing time:2025-03-31
This work is licensed under a Creative Commons Attribution 4.0 International License