Measures for Prevention and Control of Hydrogeological Investigation Issues

Guo-Hui Wang



简介

Hydrogeological investigation is an important part of water conservancy engineering, often facing issues such as inaccurate data, improper methods, and safety risks. This article proposes preventive measures. Enhancing the quality and technical level of survey personnel, introducing advanced technology and equipment, establishing strict survey standards and procedures, and strengthening safety management are suggested. These measures aim to improve the accuracy and effciency of surveys, ensuring the safety and stability of engineering projects. Implementing these measures can provide solid geological support for water conservancy projects and promote sustainable development.

关键字

Hydrogeological investigation; issues; preventive measures

全文

PDF

参考文献

[1]Tan, X. F. (2019). Discussion on Hydrogeological Investigation and Disaster Prevention Techniques for Water Conservancy Engineering. Low Carbon World, (24), 91-92.
[2]Zhang, J. (2019). Discussion on Problems and Preventive Measures in Hydrogeological Investigation for Water Conservancy Engineering. World Nonferrous Metals, (16), 243-244.
[3]Yang, Y. H. (2020). Analysis on Hydrogeological Investigation and Disaster Prevention Techniques for Water Conservancy Engineering. Science, Technology, Innovation and Application, (21), 44-45.
[4]Wang, H. L. (2020). Exploration of Hydrogeological Investigation and Disaster Prevention Techniques for Water Conservancy Engineering. World Nonferrous Metals, (19), 211-212.

版权所有 © 2024 Guo-Hui Wang Creative Commons License 出版时间:2024-04-30
本作品采用以下许可协议授权: 知识共享 署名 4.0 国际许可协议